* Move detection category under image category
* Add missing categories
* Move detection nodes to detection category
* Move save nodes to image root catefory
* Rename postprocessors
* Move mask category under image
* Move guiders category to parent level at root of sampling category
* Move custom_sampling category to parent level at the root of sampling category
* Modify description of LoRA loaders
* Fix node id SolidMask
* Move VOID Quadmask under image/mask
* Group compositing nodes under image/compositing
* Move load image as mask to image category for consistency with other load image nodes
* Align display name with Load Checkpoint
* Move dataset category under training category
* Rename Number Convert to Conver Number (verb first)
* Rename Canny node
* Revert wanBlockSwap + description
* Add description to RemoveBackground node
* Revert category update of dataset
The 10 step minimum for the AYS scheduler is pointless, it works well at lower steps, like 8 steps, or even 4 steps.
For example with LCM or DMD2.
Example here: https://i.ibb.co/56CSPMj/image.png